Our ultra-low emission hybrid platforms with ‘active’ generator consume
~20% less fuel than conventional systems. The platform intelligently
manages multiple energy sources to produce UPS-quality 24/7 power.
Ideal when the availability, predictabilty, or cost of fuel is a problem.
WHERE IT APPLIES
Blue Stream ultra-low emission hybrid
platforms serve remote and challenged power needs up to
5MW in stand-alone or grid backup configurations.
WHAT IT DELIVERS
Affordable and reliable off-grid power.
Reslient, green 24/7 digital power. UPS-quality. Any format.
WHAT YOU GET
Blue Stream is a Total Power Solution that
combines our modified fuel-based generator – requiring ~20%
less fuel than conventional systems – with an any mix of solar,
wind and storage. Inputs are intelligently managed to maximize
efficiency. Platforms are resilient, long lasting and scalable.
POWER THROUGH
Ultra-low emission UPS-Quality 24/7 power in an compact, safe, highly secure, decentralized platform. Unlike
conventional systems, our variable speed ‘Active’ generator produces power at low rpms, reducing fuel consumption
and extending engine life. Digital load balancing ensures uninterrupted power. The quality and type of power remain
constant – NO switching delays. NO electrical noise. NO uninterrupted power system (UPS) needed.
24/7 PRIME POWER
UPS-QUALITY & ON-DEMAND
Slide
“The efficiency rating of conventional fuel-based generators is less than 50%. Fuel cost, which dominates overall operations cost, is variable and unpredictable. In addition, fuel-based systems emit harmful emissions – CO, HC, PM and NOx.”
Slide
“Systems without feedback are disconnected by definition. Blueflux systems employ an intercommunications network with synchronizedmanagement of system component assets.” – Blueflux Team
Slide
“We design stand-alone power solutions with conventional fuel-based power generation that last longer, are ultra-efficient, near-green and on-demand ” – Blueflux Power
24/7 POWER
CLEAN, GREEN POWER WITH LESS FUEL
Advanced Power Management Controls dynamically monitor and seamlessly blend multiple energy
sources (solar, wind, grid backup) to produce any format power while consuming ~20% less fuel. Blueflux
hybrid platforms make practically any fuel-based system cleaner and more efficient.
HOW IT WORKS
ANY CONVENTIONAL
FUEL-BASED MOTOR
Motor/Driver
BLUEFLUX PROPRIETARY
BOOSTER TECHNOLOGIES
Blueflux Motor Management Systems enable multifuel capabilities to boost output efficiency, reduce
fuel consumption and lower emissions
BLUEFLUX PATENTED
ULTRA-HIGH EFFICIENCY
Active Alternator
Polyphase and variable speed with
Regenerative Power Technologies:
Magnetic Booster, Waste Energy Storage
BLUEFLUX POWER
MANAGEMENT CONTROLS
Our proprietary software and electronics apply AI-based predictive controls to dynamically balance an
any-mix of DERs (Distributed Energy Resources) to enhance performance and reduce fuel consumption.
The system also integrates our advanced accumulator technologies to optimize system performance
and produce UPS-Quality digital power at unmatched efficiency and economic savings.
ANY MIX OF ENERGY
INPUT SOURCES
*Depending on deployment criteria (client objectives & renewables availability), systems can be
configured to provide ultra-high efficiency power, up to 100% green ‘zero emission’ power.
ANY FORMAT POWER
(ANALOG OR DIGITAL)
Any Power Format
Output power can be delivered
in any either / or configuration.
Power Factor Management
Instant Power Factor Correction
and Inrush Power Management.
Active Rectification
Minimizes power loss at
variable motor speeds.
3-Tier Communications Network
Highly secure and redundant synchronized management of all assets. Includes advanced cybersecurity
framework providing the highest level of security against intrusion and power theft.
YOUR POWER. YOUR CONTROL
JUST DON’T LET IT GO TO YOUR HEAD
VISIBILITY OF INFIELD ASSETS
From anywhere (web or app). Receive SMS/text-based
alerts, collect data logs on one or multiple devices.
REMOTE MONITORING & CONTROL
Override automatic energy input source selections.
View runtime & performance data: Energy efficiency,
fuel use, voltage & current output, carbon offset, energy
forecasting, system health, etc.