Power challenges exist in every corner, category, and market in the world. We focus on targeted industrial and
commercial verticals, with the goal to build a few strategic relationships per vertical market and per region. We
are seeking projects that have limited access to, and/or high-cost power. Our customers want environmentally
responsible power, while benefiting from the reliability and resilience of conventional power generation.
WE SOLVE THESE
COMMON POWER PROBLEMS
Poor Reliability – Unable to deliver clean, consistent, on-demand power.
No Resiliency – Power systems are subject to weather-related disruption
Gaps in Security – Power systems are subject to theft, cyber attack.
High Costs – Expensive power, supply chain and other operations costs
Cost Uncertainty – Unpredictable swings in fuel, maintenance, replacement costs
Inability to Scale – Due to space restrictions, and/or transmission limitations
Limited Options – Noisy, polluting generators vs green, but intermittent power sources
Seeking a ‘Green’ Solution – A desire to move towards a zero carbon footprint
Slide
“Blueflux’s ‘torque injection’ technologies solve the low caloric value problem of biogas, and can be retrofitted onto an existing OPRA turbine.” – Wastewater Systems Operator
Slide
“Our cold storage facilities are located in areas where grid power is unavailable. Blueflux’s off grid systems open up a new world of possibilities for us.” – Farm Co-Op/India
Slide
“We operate in some of the most delicate and pristine environments on earth, while at the same time catering to a customer base who demands amenities that require power. Blueflux helps meet both needs.” – Resort Operator
THE WORLD’S #1 ENERGY CONSUMER
43% of the worlds energy is consumed by the conditioning and
management of buildings. The 2 billion air conditioners in the world
today is projected to grow to 5.6 billion units globally by 2050.
– IEA (International Energy Agency)
EVERYONE NEEDS POWER
Here are a few of the many power applications that Blueflux Power solutions solve.
WATER SYSTEMS
PROBLEM: Pumps consume vast amounts of electric power in a variety of applications; wastewater treatment facilities, well pumps, cooling/heating, irrigation, and industrial uses.
SOLUTION: Blueflux platforms can be configured to deliver the optimal format of power for any type of pump, UPSquality 3-phase AC power or DC power.
COLD STORAGE
PROBLEM: These facilities need high-quality conditioned power. In many cases, grid power is not available. Primary power & back up systems are expensive to build and maintain.
SOLUTION: Blueflux delivers affordable near-green power (instant response to inrush current) for HVAC systems. Our proprietary Smart Controls maximize compressor efficiencies.
CELL TOWERS
PROBLEM: Cell towers are often located in remote/challenging locations with no grid availability. Telcograde 48V DC is difficult and expensive to maintain. Power represents ~40% of tower operators cost.
SOLUTION: Blueflux delivers highest reliability power, even in remote (off grid) locations. Our near-green
platforms use ~20% less fuel, while eliminating the need for costly fuel-based backup systems.
EV CHARGE STATIONS
PROBLEM: High costs for EV charge station & transmission
infrastructure & limited grid availability. EV stations produce
grid instability (frequency fluctuation, reduced power factor).
SOLUTION: Blueflux delivers smart green EV power,
independent from the grid. Platforms deliver any voltage/
current range, including high-voltage fast charge.
MINING OPERATIONS
PROBLEM: Mines use volumes of 3-Phase power, often
in harsh, remote locations. Fuel is expensive to buy and
transport. Power conversion losses add to the inefficiencies.
SOLUTION: Blueflux platforms deliver on demand power
in the desired format, while using less fuel, and extending
system life and reducing air emissions.
REMOTE ECO-SENSITIVE SITES
PROBLEM: The most fragile, remote environments have the dual problem of high costs for fuel and
transportation, and the limitations of power quality and availability from clean renewable sources.
SOLUTION: Blueflux Platforms enable the best of both worlds – Much greener power (up to 100% green)
while delivering high-quality, uninterrupted prime power in a compact, secure, and hardened platform.
BE A POWER BROKER
WE CAN HELP YOU POWER PRACTICALLY ANYTHING
Projects are accepted based on a comprehensive Project Criteria Process that considers factors, including:
The region’s access, infrastructure, and stability, financial and support requirements, and others