Control your power.
Control your future.
The future is distributed,
intelligent and on-demand.
Power systems that deliver energy autonomy – without compromising scalability, economics, or reliability. Blueflux provides superior power quality and long-term flexibility while adapting to real-world constraints.
Any energy mix. Any load, format or location.
POWER
GENERATION
Distributed, autonomous,
efficient and low-emission.
ENERGY
STORAGE
Safe, efficient hybrid +
just-in-time delivery.
POWER
DISTRIBUTION
AI-optimized, cyber-
secure power delivery.
POWER
MANAGEMENT
Integrated transformers,
switchgear and controls.
Built for today.
Ready for what's coming.
Global power demand is rising faster than legacy infrastructure can respond.
AI is redrawing the industrial map. Grid reliability is eroding. And energy costs are no longer predictable – or sustainable.
Blueflux Power was built for this moment.
One platform.
Many missions.
Grid-optional by design – kWs to GWs.
GRID CONNECTED
Industrial and Commercial Power –
Optimized Grid-Hybrid Operation
GRID INDEPENDENT
Distributed Power – Autonomous,
Redundant Mesh Networks
GRID-ISLAND HYBRID
Distributed Hybrid Power –
Autonomy First, Grid Supported
Specialty power.
High-density. Low-latency.
Zero-downtime goals.
DATA CENTERS
High-Density – Onsite 48V DC
Scale-Up/Scale-Out Power.
Onsite HF-DC / 48V DC delivers clean power to racks with fewer conversions, improving efficiency and PUE impact. Built to scale up (MW/rack roadmap) and scale out (modular blocks) with UPS-grade quality.
GRID BALANCING
Grid Stabilization – Autonomous
Containerized Energy Nodes.
Containerized nodes inject or absorb current at weak points – stabilizing frequency/voltage without major rebuilds. AI dispatch uses price, load, and weather signals; nodes can mesh for regional resilience.
MINING
Off-Pit Generation – Compressed-Air
Energy + HF-DC / 48V DCC
Off-pit hybrid compression feeds rugged air trunks to bench-level HF-DC / 48V DCC converters – cutting diesel, removing HV from the face. Safer, cooler, lower-cost power for the electrified mine.
"Blueflux bridges legacy infrastructure with distributed, AI-driven power platforms – shaping the future of intelligent energy."
Why Blueflux Power.
Intelligent distributed power
isn't a concept. It's a roadmap
– deployable, scalable reality.
Designed in the USA, built for global deployment, and ready to redefine how power is generated, stored, and delivered – on the grid or off. Our modular systems install in months, evolve in place, and deliver "perfect power" under changing conditions.
UNMATCHED EFFICIENCY
Conversion loss reduction
Up to 96% HF-DC efficiency
ECONOMICALLY SCALABLE
Rapid deployment, expansion
and site adaptability
FUEL FLEXIBILITY
HHO, Compressed Air,
Solar, Wind, RNG, others
LOWER TCO
~40% lower lifecycle cost vs.
legacy battery systems
FULL IN-HOUSE STACK
Hardware, Firmware, Software, AI
7-Layer OSI, Role-Based Access
BUILT-IN CYBERSECURITY
Isolated comms, authenticated
control, anomaly detection
What makes us different
We design and build our own engineered products,
associated software, and electronics.
We're practical innovators – not just systems integrators. Our R&D lives at the intersection of theory, evidence, and field practice. Because we build, own, and operate our equipment, we engineer for reliability and life. We "own" the process end-to-end – core components, firmware, and controls are our designs, built and managed by us.