Generates power at any rotational speed. Maintains (or amplifies) a rotation speed even when the wind diminishes.
Hardened design built to withstand extreme
wind events and function even in partial
flood conditions.
Compact, architecturally pleasing can accommodate custom lighting. Underground infrastructure minimizes exposed structure
Eliminates conventional costs, ie; cabling, inverters, fewer/to no batteries. Far more likely to survive a weather event.
Wind energy is converted to potential
energy (compressed air), and stored until
called upon.
No speed governors – captures energy
and generates power at any speed.
Potential energy is stored in the form of
breathable compressed air (No harmful
and expensive chemical batteries).
Eliminates fire hazard (common in VAWT
systems and chemical batteries).
In case of mechanical failure – no
electrical damage occurs.
Intelligent controls manage all input and
load demands.
Produces the desired power format –
UPS-quality digital power.
Stand-alone config: Dynamically applies
stored energy to meet power demand.